Examining the Project Success Antecedents of Public Private Partnerships (PPP) in Public Infrastructure Works of Zambia
DOI:
https://doi.org/10.59413/ajocs/v6.i.1.11Keywords:
Public Private Partnerships (PPP), Public Infrastructure, Project Success, ZambiaAbstract
Infrastructure development has long been considered a catalytic factor in a country's economic development. Zambia has experienced a deficit in infrastructure that has prevented developmental and economic growth. For far too long now, policy makers have aimed at reducing the national debt, and find a better financing method for infrastructure projects, and have now turned to Public Private Partnerships (PPP) to finance these projects. However, the problem of PPPs has been that of poorly implemented critical success factors that have led to deprived financing of infrastructure, budget constraints, inefficiencies in managing infrastructure on the side of the public sector, and poor public spending poor public spending and inefficiencies in managing infrastructure on the public sector side. This study examined the influence of PPP success antecedents on actual PPP project success. A quantitative research design was employed with data collected using a structured questionnaire from a sample of 90 PPP practitioners drawn from both the public and private sector organisations. Data collected was analysed using correlation and hierarchical regression models. The findings indicate that the institutional theory and the Human capital theories are applicable in the Zambian context. Further, favourable business environment factors, reliable concessionaire consortium factors, sound financial factors and economic viability and appropriate risk allocation factors are significant determinants with a combined large effect size of (0.917) and a coefficient of determination of 82.8%. More so, finds revealed that the largest predictors of actual PPP project success in Lusaka are sound financial factors, economic viability and appropriate risk allocation factors.
Downloads
References
Abdel Aziz, A.M. (2007), “Successful Delivery of Public-Private Partnerships for Infrastructure Development”, Journal of Construction Engineering and Management, Vol. 133 No. 12, pp. 918–931, DOI: https://doi.org/10.1061/(ASCE)0733-9364(2007)133:12(918)
Ahmadabadi, A.A. and Heravi, G. (2019), “The effect of critical success factors on project success in Public-Private Partnership projects: A case study of highway projects in Iran”, Transport Policy, Elsevier Ltd, Vol. 73 No. July 2017, pp. 152–161, DOI: https://doi.org/10.1016/j.tranpol.2018.07.004
Almarri, K., and Boussabaine, H., (2017) “The Influence of Critical Success Factors on Value for Money Viability Analysis in Public–Private Partnership Projects” DOI: https://doi.org/10.1177/875697281704800408
Amovic, G., Maksimovic, R., and Buncic, S., (2021). “Critical Success Factors for Sustainable Public-Private Partnership (PPP) in Transition Conditions: An Empirical Study in Bosnia and Herzegovina” Department of Industrial Engineering and Management, Faculty of Technical Sciences, University of Novi. DOI: https://doi.org/10.3390/su12177121
Babatunde, S.O., Opawole, A. and Akinsiku, O.E. (2012), “Critical Success Factors in PPP on infrastructure delivery in Nigeria”, Journal of Facilities Management, Vol. 10 No. 5, pp. 212–225. DOI: https://doi.org/10.1108/14725961211246018
Becker, G.S. (1964), Human Capita A Theoretical and Empirical Analysis, with Special Reference to Educatio, The University of Chicago Press.
Becker, G.S., Hubbard, W.H.J. and Murphy, K.M. (2010), “Explaining the Worldwide Boom in Higher Education of Women”, Journal of Human Capital, Vol. 4 No. 3, pp. 203–241, DOI: https://doi.org/10.1086/657914
Busenitz, L.W. and Barney, J.B. (1997), “Differences between entrepreneurs and managers in large organizations: Biases and heuristics in strategic decision-making”, Journal of Business Venturing, Vol. 12 No. 1, pp. 9–30, DOI: https://doi.org/10.1016/S0883-9026(96)00003-1
Busenitz, L.W., Fiet, J.O. and Moesel, D.D. (2004), “Reconsidering the venture capitalists’ ‘value added’ proposition: An interorganizational learning perspective”, Journal of Business Venturing, Vol. 19 No. 6, pp. 787–807, DOI: https://doi.org/10.1016/j.jbusvent.2003.06.005
Chan, Y.K.S.W. and A.P.C. (2010), “Risk Allocation in Public-Private Partnership Infrastructure Projects: Comparative Study”, Journal of Infrastructure Systems, Vol. 16 No. 4, pp. 343–351,
Cheung, E. (2009), Developing a Best Practice Framework for Implementing PPP in Hong Kong, School of Urban Development, Faculty Og Built Environment and Engineering, Queensland University of Technology, Queensland.
Cheung, E., Chan, A.P.C. and Kajewski, S. (2012), “Factors contributing to successful public private partnership projects”, Journal of Facilities Management, Vol. 10 No. 1, pp. 45–58, DOI: https://doi.org/10.1108/14725961211200397
Croce, R. Della and Gatti, S. (2015), “International Trends in Infrastructure Finance”, Public Private Partnerships for Infrastructure and Business Development, Palgrave Macmillan US, New York, pp. 81–100, DOI: https://doi.org/10.1057/9781137541482_5
Dimaggio, P.J. and Powell, W.W. (1983), “the Iron Cage Revisited: Institutional Isomorphism and Collective Rationality in Organizational Fields”, American Sociological Review, Vol. 4 No. 2, pp. 147–160. DOI: https://doi.org/10.2307/2095101
Dulaimi, M.F., Alhashemi, M., Ling, F.Y.Y. and Kumaraswamy, M. (2010), “The execution of public–private partnership projects in the UAE”, Construction Management and Economics, Vol. 28 No. 4, pp. 393–402, DOI: https://doi.org/10.1080/01446191003702492
Engle, N.L. (2011), “Adaptive capacity and its assessment”, Global Environmental Change, Vol. 21 No. 2, pp. 647–656, DOI: https://doi.org/10.1016/j.gloenvcha.2011.01.019
Estache, A., Serebrisky, T. and Wren-Lewis, L. (2015), “Financing infrastructure in developing countries”, Oxford Review of Economic Policy, Vol. 31 No. 3–4, pp. 279–304, DOI: https://doi.org/10.1093/oxrep/grv037
European Court of Auditors. (2018), “Public Private Partnerships in the EU: Wide spread shortcomings and limited benefits”, Curia Rationum Publishing.
Firmino, S.I. (2018), “Critical success factors of Public-Private Partnerships: political and institutional aspects. Case study of highways in Portugal”, Revista de Administração Pública, Vol. 52 No. 6, pp. 1270–1281, DOI: https://doi.org/10.1590/0034-761220170228
Foster, R., (2010) “Preserving the Integrity of the PPP Model in Victoria, Australia, during the Global Financial Crisis” Public-Private Partnerships Solutions. World Bank, Washington, DC
Foster, V., and Dominguez, C., (2013) “Zambia's infrastructure: A continental perspective,” Policy Research Working Papers,
Galilea, P., and Medda, F., (2010) “Does the political and economic context influence the success of a transport project? An analysis of transport public-private partnership” Research in Transportation Economics, DOI: https://doi.org/10.1016/j.retrec.2010.10.011
Ho, P.S and Tsui, W.C (2009) “The Transaction Costs Of Public-Private Partnerships: Implications on PPP Governance Design” Project: Government Policies on Public-Private Partnerships (PPPs),
Hodge, G., Greve, C., and Boardman (2017) “Public-Private Partnerships: The Way They Were and What They Can Become” Australian Journal of Public Administration Volume 76, Issue 3 p. 273-282, DOI: https://doi.org/10.1111/1467-8500.12260
Jones, C. (2002), “Sources of U.S. Economic Growth in a World of Ideas”, American Economic Review, Vol. 92 No. 1, pp. 220–239. DOI: https://doi.org/10.1257/000282802760015685
Kahwajian, A., Baba., S.,Amoudi, O., and Wanos, M., (2014) “Identification of Critical Success Factors (CSFs) for Public Private Partnership (PPP) construction projects in Syria” Jordan Journal of Civil Engineering 8(4):393-405
Ke, Y., Wang, Q.S., and Chan, P.C.A., (2010) “Risk Allocation in Public-Private Partnership Infrastructure Projects: A Comparative Study” Journal of Infrastructure Systems DOI: https://doi.org/10.1061/(ASCE)IS.1943-555X.0000030
Kivleniece, I. and Quelin, B. V. (2011), “Creating and Capturing Value in Public-Private Ties: A Private Actor’s Perspective”, Academy of Management Review, Vol. 37 No. 2, pp. 272–299, DOI: https://doi.org/10.5465/amr.2011.0004
Li, B., Akintoye, A., Edwards, P.J. and Hardcastle, C. (2005), “Critical success factors for PPP/PFI projects in the UK construction industry”, Construction Management and Economics, Vol. 23 No. 5, pp. 459–471, DOI: https://doi.org/10.1080/01446190500041537
Lüthje, C. and Franke, N. (2003), “the ‘making’ of an entrepreneur: testing a model of entrepreneurial intent among engineering students at MIT”, R&D Management, Vol. 33 No. 2, pp. 135–147, DOI: https://doi.org/10.1111/1467-9310.00288
Mulindwa, M. (2014), “Public Private Partnerships in Infrastructure Development in Zambia,” Zambia Development Agency, 29/01/2014
Mladenovic, G., Wundsch, B., Salaj, T.A., and Vajdic, N., (2013) “Use of key performance indicators for PPP transport projects to meet stakeholders' performance objectives” Built Environment Project and Asset Management, DOI: https://doi.org/10.1108/BEPAM-05-2012-0026
Mwiya, B., kumbi, F., Shikaputo, C., Kabala, E., Kaulung’ombe, B. and Siachinji, B. (2017), “Examining the factors Influencing E-Banking Adoption: Evidence from Bank Customers in Zambia,” American Journal of Industrial and Business Management, 7, pp. 741-759. DOI: https://doi.org/10.4236/ajibm.2017.76053
Mwanaumo, E., et al. (2021)” 24 Innovative Critical Success Factors for Public – Private Partnerships (PPP) in Infrastructure Projects of Developing Countries. A Case of Zambia” DOI: https://doi.org/10.1515/9783110651768-024
Mwanaumo, E. and Thwala, W.D. (2012), “Construction practitioners’ awareness of occupational diseases in the Botswana construction industry : an exploratory study : original research”, Occupational Health Southern Africa, Vol. 18 No. 4.
Mwanaumo, E.M. (2016), “An evaluation of employees welfare and its effects on productivity in the Zambia construction industry”, Livingstone, Sn.
Mwanaumo, E.M., Thwala, W.D. and Mambwe, M. (2018), “Multi Stakeholder Consultative Framework for Construction Health and Safety: Role of Client and Project Manager”, Proceedings of the 5th International Conference on Development and Investment in Infrastructure—DII.
Mwanaumo, E., Ngoy, K. S., & Kunda, V. (2025). Exploring Determinants of Financial Access for SMEs in Zambia ’ s Construction Sector. DOI: https://doi.org/10.59413/ajocs/v6.i.1.3
Ngoy, K. S., N’Gandu, V. B., & Mwanaumo, E. (2023). Exploratory Analysis of Securities and Contractors’ All Risk Insurance Implementation in the Construction Industry of Zambia. Baltic Journal of Real Estate Economics and Construction Management, 11(1), 289–304. DOI: https://doi.org/10.2478/bjreecm-2023-0018
Ngoy, K. S., Chisumbe, S., Petere, G., Mwiya, B., & Mwanaumo, E. (2023). Factors Influencing Professional Indemnity Insurance Use in Construction Risk Management. Baltic Journal of Real Estate Economics and Construction Management, 11(1), 199–220. DOI: https://doi.org/10.2478/bjreecm-2023-0013
North, D.C. (1990), Nstitutions, Institutional Change and Economic Performance. DOI: https://doi.org/10.1017/CBO9780511808678
Opara, M., Elloumi, F., Okafor, O. and Warsame, H. (2017), “Effects of the institutional environment on public-private partnership (P3) projects: Evidence from Canada”, Accounting Forum, Elsevier Ltd, Vol. 41 No. 2, pp. 77–95, DOI: https://doi.org/10.1016/j.accfor.2017.01.002
Osei-Kyei, R. and Chan, A.P.. (2017a), “Implementing public–private partnership (PPP) policy for public construction projects in Ghana: critical success factors and policy implications”, International Journal of Construction Management, Vol. 17 No. 2, pp. 113–123, DOI: https://doi.org/10.1080/15623599.2016.1207865
Osei-Kyei, R. and Chan, A.P.C. (2015), “Review of studies on the Critical Success Factors for Public–Private Partnership (PPP) projects from 1990 to 2013”, International Journal of Project Management, Vol. 33 No. 6, pp. 1335–1346, DOI: https://doi.org/10.1016/j.ijproman.2015.02.008
Osei-Kyei, R. and Chan, A.P.C. (2017b), “Comparative Analysis of the Success Criteria for Public–Private Partnership Projects in Ghana and Hong Kong”, Project Management Journal, Vol. 48 No. 4, pp. 80–92, DOI: https://doi.org/10.1177/875697281704800407
Panayides, P.M., Parola, F. and Lam, J.S.L. (2015), “The effect of institutional factors on public–private partnership success in ports”, Transportation Research Part A: Policy and Practice, Vol. 71, pp. 110–127, DOI: https://doi.org/10.1016/j.tra.2014.11.006
PPP Unit Zambia, Ministry of Finance (2018), “Public Private Partnership Report, 2018”
Qiao, L., Wang, S.Q., Tiong, R.L.K. and Chan, T.-S. (2001), “Framework for Critical Success Factors of BOT Projects in China”, The Journal of Structured Finance, Vol. 7 No. 1, pp. 53–61, DOI: https://doi.org/10.3905/jsf.2001.320244
Sanni, O. A. 2016 “Factors determining the success of public private partnership projects in Nigeria” Bells University of Technology, Ota, Nigeria DOI: https://doi.org/10.5130/AJCEB.v16i2.4828
Schwab, K., (2016) “The Global Competitiveness Report 2016–2017” World Economic Forum, ISBN-13: 978-1-944835-04-0.
Scott, W. Richard, 2008.” Institutions and Organizations: Ideas and Interests”. Los Angeles, CA: Sage Publications. Marquis, Christopher; Tilcsik, András (2016-10-01)
Scott, P. (1995), The Meanings Of Mass Higher Education, McGraw-Hill Education (UK).
Shi, S., Chong, H.-Y., Liu, L. and Ye, X. (2016), “Examining the Interrelationship among Critical Success Factors of Public Private Partnership Infrastructure Projects”, Sustainability, Vol. 8 No. 12, p. 1313, DOI: https://doi.org/10.3390/su8121313
Silvestre, C.H., and Araújo, J.F.F., (2012) “Public-Private Partnerships/Private Finance Initiatives In Portugal: Theory, Practice, and Results” Public Performance & Management Review, Vol. 36, No. 2 (December 2012), pp. 316-339. DOI: https://doi.org/10.2753/PMR1530-9576360208
Tiong, R.L.K. (1996), “CSFs in Competitive Tendering and Negotiation Model for BOT Projects”, Journal of Construction Engineering and Management, Vol. 122 No. 3, pp. 205–211, DOI: https://doi.org/10.1061/(ASCE)0733-9364(1996)122:3(205)
United Nations Development Programme (2010), “Assessment of Development Results Evaluati On Of Undp Contri Buti On Zambia”.
Wibowo, A. and Alfen, H.W. (2015), “Government-led critical success factors in PPP infrastructure development”, Built Environment Project and Asset Management, Vol. 5 No. 1, pp. 121–134, DOI: https://doi.org/10.1108/BEPAM-03-2014-0016
World bank. (2018), Annual World Bank Report, (2018).
Yahaya, A.D. (2008), New mission and role of the state (public sector) in relation to the private sector and civil society, Pan African Conference for Chairmen of National Commissions for Administrative Reforms, Tangier (Morocco) 25-27 February, pp. 1-22.
Zhang, S., Gao, Y., Feng, Z. and Sun, W. (2014), “PPP application in infrastructure development in China: Institutional analysis and implications”, International Journal of Project Management, The Authors, Vol. 33 No. 3, pp. 497–509, DOI: https://doi.org/10.1016/j.ijproman.2014.06.006
Downloads
Published
Issue
Section
License
Copyright (c) 2025 Erastus Mwanaumo, Alexander (Author); Prof Erastus Misheng'u Mwanaumo (Translator); Dr Gebremedhin Fikadu, Dr. Steve Kabemba Ngoy, Dr Penjani Hopkin Nyimbili (Author)

This work is licensed under a Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.








