Project Management Practices and Performance of CDF-Funded Educational Infrastructure Projects in Mavoko Constituency, Kenya

Authors

DOI:

https://doi.org/10.59413/ajocs/v6.i6.1

Keywords:

Project planning, Stakeholder involvement, Monitoring & evaluation, Project performance

Abstract

This study explores the relationship between Project management practices and the performance of educational projects, specifically focusing on Constituency Development Fund (CDF) funded educational infrastructure projects in Mavoko Constituency, Kenya. The study sets the stage for understanding how various management practices influence the success of educational projects financed through the CDF. It provides a comprehensive background on the role of CDF in educational development, outlining the significance of effective project management practices in enhancing project outcomes. The study articulates the problem statement as inconsistences performance of educational infrastructure (cost, time, quality) due to, substandard construction, and resource misallocation hence need for better project management practices. The objectives of the study were  to examine the project management practices employed in the implementation of CDF-funded educational projects in Mavoko Constituency; To assess the performance of CDF-funded educational projects in Mavoko Constituency in terms of cost, time, quality, and stakeholder satisfaction; To determine the relationship between project management practices and the performance of CDF-funded educational projects in Mavoko Constituency. The research focuses on key theories namely, Project Management Theory, Stakeholder Theory, and Results-Based Management (RBM) aiming to evaluate the impact of project planning, stakeholder management, and quality management, on project performance. The study employed descriptive research design since it describes the characteristics of a population without manipulating variables.  The target population was 800 participants from a total population of 105, both primary and secondary public schools.  The sample size included 266 respondents selected through stratified random sampling techniques. Primary data collected using a questionnaire issued to a sample population of respondents in teachers, CDF officers, project team at selected schools within Mavoko constituency. and analyzed using statistical page for the social sciences (SPSS). The study employed standardized data collection procedures and rigorous analysis techniques to ensure reliability, using Cronbach’s Alpha. To enhance validity, this study triangulated data from interviews and questionaries to strengthen the evidence base and ensure that the findings robustly address the research questions. A pilot test was conducted at Kathiani Primary School with 10% of sample size to establish both the content validity and reliability of the questionnaire. Regression analysis analyzed the relationship between two variables and made predictions, inferring causal relationships, provided the assumptions are met. between variables. Data was presented with descriptive statistics. Study findings were: Inadequate Planning, 47% disagreed that planning was sufficient. limited Stakeholder Involvement, 41% felt that engagement was inconsistent and Weak Monitoring and Evaluation, 50% disagreed on the regularity of monitoring practices.  Finally, the study concluded that strengthening project planning practices—specifically in planning, stakeholder involvement, and monitoring & evaluation is essential for enhancing project performance. It recommends prioritizing training for project managers on effective planning tools. Additionally, institutionalizing stakeholder engagement through a participatory approach in project identification, planning, and implementation is vital to foster collaboration and ensure that all stakeholders are actively involved. Implementing these recommendations can significantly improve project outcomes.  

Downloads

Download data is not yet available.

References

Atkinson, R. (1999). Project management: Cost, time and quality, two best guesses and a phenomenon, it’s time to accept other success criteria. International Journal of Project Management, 17(6), 337–342. DOI: https://doi.org/10.1016/S0263-7863(98)00069-6

Awuor, P., & Ndiritu, S. (2022). Community participation and performance of CDF-funded projects in Kenya: Evidence from rural constituencies. Journal of African Public Administration and Development, 9(1), 44–62.

Barney, J. B. (1991). Firm resources and sustained competitive advantage. Journal of Management, 17(1), 99–120. DOI: https://doi.org/10.1177/014920639101700108

Biwott, C. (2021). Project planning and implementation of CDF-funded projects in Kenya. African Journal of Project Management, 16(2), 55–73.

Bourne, L., & Walker, D. H. T. (2006). Visualising and mapping stakeholder influence. Management Decision, 44(5), 649–666. DOI: https://doi.org/10.1108/00251740510597680

Chepkorir, L., & Rono, J. (2020). Monitoring and evaluation and sustainability of community development projects in Kenya. International Journal of Project Planning and Management, 12(3), 67–81.

Cleland, D. I. (1998). Project management: Strategic design and implementation. McGraw-Hill.

Creswell, J. W., & Creswell, J. D. (2018). Qualitative inquiry and research design: Choosing among five approaches (5th ed.). SAGE Publications.

Eisenhardt, K. M. (1989). Building theories from case study research. Academy of Management Review, 14(4), 532–550. DOI: https://doi.org/10.2307/258557

Freeman, R. E. (1984). Strategic management: A stakeholder approach. Pitman.

Freeman, R. E. (2010). Strategic management: A stakeholder approach. Cambridge University Press. DOI: https://doi.org/10.1017/CBO9781139192675

Gitonga, M., & Mutiso, P. (2022). Stakeholder involvement and performance of educational projects funded through the Constituency Development Fund in Kenya. Kenya Journal of Development Studies, 14(2), 33–49.

Jackson, M. C. (2003). Systems thinking: Creative holism for managers. Wiley.

Johnson, L., Smith, J., & Lee, R. (2016). Effective project management practices. Project Management Quarterly, 28(1), 15–27. DOI: https://doi.org/10.4018/978-1-5225-1790-0.ch001

Joslin, R., & Müller, R. (2015). Relationships between a project management methodology and project success in different project governance contexts. International Journal of Project Management, 33(6), 1377–1392. DOI: https://doi.org/10.1016/j.ijproman.2015.03.005

Karanja, A. (2014a). Challenges facing implementation of Constituency Development Fund projects in Kenya: Case study of Kikuyu Constituency. International Journal of Social Sciences and Entrepreneurship, 1(10), 1–25.

Karanja, P. (2013). Evaluating project performance in public sector projects. International Journal of Public Administration, 30(4), 312–328.

Karanja, P. (2014b). Factors affecting the implementation of projects under the Constituency Development Fund in Kenya: A case of Kinangop Constituency. International Journal of Social Sciences and Entrepreneurship, 1(11), 426–447.

Kariuki, M. (2014). Management of Constituency Development Fund (CDF) projects in Kenya: A case study of Nyeri Town Constituency. International Journal of Current Research and Academic Review, 2(4), 232–250.

Kerzner, H. (2017). Project management: A systems approach to planning, scheduling, and controlling. Wiley.

Kerzner, H. (2019). Project management: A systems approach to planning, scheduling, and controlling. Wiley.

Kimani, P. (2014). Planning in project management: Strategies for success. Journal of Project Planning, 23(3), 41–55.

KIPPRA (Kenya Institute for Public Policy Research and Analysis). (2018). Evaluation of the Constituency Development Fund. KIPPRA.

Kiringai, J., & Mugambi, G. (2019). An assessment of the performance of the Constituency Development Fund in Kenya. International Budget Partnership.

Koech, P., & Too, R. (2016). Cost performance analysis in public infrastructure projects. Journal of Financial Management in Construction, 31(1), 78–86.

Kothari, C. R. (2019). Research methodology: Methods and techniques (2nd ed.). New Age International.

Kusek, J. Z., & Rist, R. C. (2004). Ten steps to a results-based monitoring and evaluation system. World Bank Publications. DOI: https://doi.org/10.1596/11269

Lock, D. (2020). Project management. Gower. DOI: https://doi.org/10.1201/9781315245911

Mburu, D. (2015). User satisfaction as a measure of project success. Journal of Development Studies, 26(3), 301–316.

Mazzucato, M. (2015). The entrepreneurial state: Debunking public vs. private sector myths. Anthem Press.

Mitchell, R. K., Agle, B. R., & Wood, D. J. (1997). Toward a theory of stakeholder identification and salience: Defining the principle of who and what really counts. Academy of Management Review, 22(4), 853–886. DOI: https://doi.org/10.2307/259247

Mulaku, G. C., & Wanjiru, R. K. (2016). Constituency Development Fund (CDF) and its role in promoting education in Kenya: A critical appraisal. International Journal of Education and Research, 4(2), 371–384.

Muli, D., & Musyoka, K. (2020). Time management practices and timely completion of CDF-funded educational projects in Kenya. East African Journal of Project Management, 5(1), 28–46.

Mwai, G. M., Muturi, W., & Ntale, J. (2021). Influence of monitoring and evaluation practices on performance of Constituency Development Fund projects in Kiambu County, Kenya. International Journal of Project Management, 4(1), 1–14.

Mwangi, I. (2018). The role of Constituency Development Fund (CDF) in rural development: A case of Gatundu South Constituency. Journal of Public Administration and Governance, 8(3), 93–110.

Mwangi, K., Kinyua, M., & Kirui, S. (2019). Quality assurance in project management: Strategies and outcomes. Journal of Quality in Maintenance Engineering, 35(4), 257–270.

Mwangi, P. M., & Rotich, D. C. (2020). Effect of stakeholder management on implementation of Constituency Development Fund projects in Gatanga Constituency, Murang'a County, Kenya. International Journal of Project Management, 3(1), 1–18.

Mwangi, T., & Karanja, J. (2018). Stakeholder engagement in development projects. Journal of Development Studies, 34(3), 201–219.

Ndung'u, J. (2017). Impact of Constituency Development Fund on socio-economic development: A case study of Nakuru Town Constituency. Journal of Economics and Sustainable Development, 8(17), 140–150.

Njeru, M. (2017). The role of monitoring and evaluation in project management. Project Management Insights, 19(4), 78–92.

Njoroge, T., Mwangi, J., & Kamau, R. (2018). Key performance indicators in project management: A case study of educational projects in Kenya. Project Management Journal, 37(2), 19–34.

Ngugi, P., & Kimani, S. (2021). Quality assurance mechanisms and performance of infrastructure projects under CDF in Kenya. Journal of Construction and Development in Africa, 7(4), 112–128.

Ogutu, A. (2014). Time management in construction projects: Causes and consequences of delays. Construction Management and Economics, 29(5), 456–469.

Omondi, R., & Waweru, P. (2023). Cost overruns in CDF-funded projects: An analysis of determinants in Kenyan constituencies. African Journal of Governance and Development, 10(2), 61–80.

Opiyo, J., & Gichuki, A. (2020). Community satisfaction and sustainability of devolved fund projects in Kenya. International Journal of Community Development, 6(3), 49–65.

PMI (Project Management Institute). (2021). A guide to the project management body of knowledge (PMBOK® guide) (7th ed.). Project Management Institute.

Project Management Institute. (2017). A guide to the Project Management Body of Knowledge (PMBOK® Guide) (6th ed.). Project Management Institute.

Rogers, E. M. (2003). Diffusion of innovations (5th ed.). Free Press.

Sarlak, M. A. (2012). The new faces of organizations in the 21st century: A management and organizational reference book. NAISIT Publishers.

Saunders, M. N. K., Lewis, P., & Thornhill, A. (2007). Research methods for business students (4th ed.). Financial Times/Prentice Hall.

Senge, P. M. (2018). The fifth discipline: The art and practice of the learning organization (Rev. ed.). Currency.

Skyttner, L. (2001). General systems theory: Ideas and applications. World Scientific. DOI: https://doi.org/10.1142/9789812384850

Smith, J., Johnson, L., & Brown, M. (2015). Project performance metrics in development projects. Journal of Project Management, 22(3), 45–57.

Srinu, G. (2023). Administrative thought. Shhalaj Publishing House.

Sterman, J. D. (2000). Business dynamics: Systems thinking and modelling for a complex world. Irwin McGraw-Hill.

UNESCO. (2020). Global Education Monitoring Report. UNESCO.

Wachira, A. (2015). Implementation strategies in project management. International Journal of Project Management, 32(2), 123–138.

Wanjiru, R. K., & Mwangi, C. I. (2018). Influence of project management practices on implementation of Constituency Development Fund projects in Kiambu County, Kenya. European Scientific Journal, 14(7), 208–229.

Wanjohi, G. (2017). Environmental impacts of construction projects in developing countries. Environmental Science and Policy, 41, 78–85.

Williams, B. (2024). The 2010–15 coalition government and the legacy of free schools in England. Policy Futures in Education, 22(5), 793–809. DOI: https://doi.org/10.1177/14782103231176360

World Bank. (2011). Monitoring and evaluation: Some tools, methods, and approaches. World Bank.

World Bank. (2020). Kenya public expenditure review: Managing resources for better service delivery. Washington, DC: World Bank.

Were, S., & Odhiambo, E. (2022). Risk assessment and management practices in devolved fund projects: A case of CDF projects in Kenya. Journal of Risk and Project Studies, 11(1), 25–39.

Downloads

Published

2025-10-27

How to Cite

Nzuki, J. ., & Kithandi, C. (2025). Project Management Practices and Performance of CDF-Funded Educational Infrastructure Projects in Mavoko Constituency, Kenya. African Journal of Commercial Studies, 6(6), 1-11. https://doi.org/10.59413/ajocs/v6.i6.1

Article PlumX Metrics

PlumX Metrics

Most read articles by the same author(s)